Fivalco Vertical Type Large Indicator Post

 Field Adjusment

  1. Remove the top section from the top of the Indicator Post assembly.
  2. Cut the required length off the bottom of the Stand pipe for the Gound Line to match up with Standpipe Gound Line mark.
  3. Set the “OPEN” and” SHUT” targets for the appropriate valve size.
  4. Reattach the Top Section to the top of the Indicator Post assembly.
  5. Design and dimensions are subject to change without notice.

Click Here to Contact Us